Skip to content
HN Pool ConstructionJacksonville, FL

Pool Construction

Pool Construction in Jacksonville, FL

Gunite and fiberglass pools designed in 3D and priced as a fixed line-item quote, built and permitted by a licensed Florida pool builder.

Mon-Fri 8am-9pm, Sat-Sun closed. We answer the phone.

In-ground pool with a paver deck beneath a screen enclosure
  • Licensed, insured builders

    Your pool is built by a licensed Florida pool builder you can look up

  • Fixed line-item pricing

    A fixed price for the scope you approve, priced line by line

  • 3D design first

    See the pool before a shovel touches the yard

  • Free on-site estimates

    No obligation

  • One point of contact

    The same person handles your design, your quote, and your questions

HN Pool Construction designs and prices new in-ground pool projects in Jacksonville, from the first sketch to a fixed line-item quote. The pool itself is built by a licensed Florida pool builder we engage, and every project is permitted and inspected under the rules that apply in Duval, St. Johns, Clay, or Nassau county. A 2026 gunite pool in this market typically starts around $65,000, and a fiberglass pool starts around $55,000.

Gunite or fiberglass: which pool fits your Jacksonville lot?

Gunite, also called shotcrete, is sprayed concrete built shape by shape on site. It handles tanning ledges, beach entries, spas, and deep ends in almost any layout, which is why most custom Jacksonville pools are gunite.

Fiberglass pools arrive as a finished shell and go in the ground much faster. Shape and size are limited to what a shell mold and a flatbed truck can deliver, but upkeep is lower. Our gunite and fiberglass pages cover each option in detail.

Who is licensed to build a pool in Florida?

Chapter 489 of the Florida Statutes sets pool construction apart from general contracting. A Certified Pool/Spa Contractor or Registered Pool/Spa Contractor license is required to build the shell, plumb the equipment, and wire the pool circuit, and the license can be looked up on the state DBPR website.

HN Pool Construction does not hold that license. We engage licensed, insured Florida pool builders to build your pool, and the permit is pulled under the license of the builder doing the work. You get that name and license number in writing before anything starts, so you can look it up yourself and confirm the insurance directly with their agent.

What permits and inspections does a Jacksonville pool need?

Every in-ground pool needs a building permit plus electrical sub-permits for bonding and equipment, and often plumbing and gas permits for a heater. The authority depends on the address: the City of Jacksonville Building Inspection Division for most of Duval, separate departments at the beaches, and county building divisions in St. Johns, Clay, and Nassau.

Inspections follow the build in order: steel and bonding before the shell is shot, deck bond and a plumbing pressure test before the deck pours, electrical rough-in and final, a barrier or safety final, and a last inspection before the pool can be filled.

What does Florida's pool safety law require?

Chapter 515 of the Florida Statutes requires at least one approved safety feature before a new pool passes final inspection: a 4-foot barrier with self-closing, self-latching gates that swing outward, an approved pool cover, exit alarms on doors and windows rated at 85 decibels, self-latching devices on those doors, or a pool alarm meeting ASTM F2208. A compliant screen enclosure with a self-closing door usually satisfies the barrier on its own, which is one reason so many Jacksonville pools are caged.

How does Jacksonville's high water table affect a pool build?

Much of Duval, St. Johns, and the beaches sit on sandy soil with groundwater a few feet down, and lots near the river or coast can hit water within the first couple feet of digging. We run well points or sump pumps during excavation so the hole stays workable while steel is tied and gunite is shot.

Every gunite pool gets a hydrostatic relief valve at the main drain so rising groundwater can enter an empty shell instead of pushing it upward. A fiberglass shell is lighter and more sensitive to flotation, which is why we never drain one and always set it on gravel with engineered backfill.

How does salt air near the coast change the equipment?

Within a few miles of the ocean or Intracoastal, airborne salt attacks standard hardware fast. We spec 316 stainless steel for handrails, ladders, and anchors, and marine-grade powder-coated aluminum for enclosure frames near the beaches, Ponte Vedra, and Amelia Island. Equipment pads closer to the water also wear faster and get a shaded, sheltered location where possible.

Does your HOA need to approve a pool?

Most planned communities here, including Nocatee, Julington Creek Plantation, Eagle Harbor, and the gated Ponte Vedra and Amelia Island neighborhoods, require architectural review approval before a county or city will accept a permit application. Reviewers typically ask about setbacks, lot coverage, enclosure color, and drainage. We prepare the site plan for that review and submit it alongside the permit so both move together.

How does the design and pricing process work?

We follow the same five steps on every project: a free on-site estimate, a 3D design of the pool and deck, a fixed line-item quote, the build, and a final walkthrough. You see the pool rendered before anyone digs, and the quoted price covers the scope you approve. Anything you add, and anything the excavation turns up that was not visible at the estimate, is priced in writing before the work happens.

How much does a new pool cost in Jacksonville, and how long does it take?

These are 2026 estimates, and our pool cost guide breaks the numbers down line by line. A base gunite pool with basic equipment and a minimal deck runs $65,000 to $110,000, and adding a spa, tanning ledge, upgraded finish, and heater moves the range to $110,000 to $180,000 and up. A fiberglass pool with a basic deck runs $55,000 to $95,000, larger shells with upgrades $95,000 to $140,000.

Permitting and HOA review typically take three to eight weeks depending on the jurisdiction. Once permitted, a fiberglass build usually finishes in four to eight weeks, and a gunite build takes ten to sixteen weeks from excavation to final inspection.

Want the numbers before you call?

Read the 2026 Jacksonville cost ranges, then decide what you want to ask us about.

Gallery

Pool Construction work

  • Rectangular pool with a dark interior finish and a narrow paver border set into a lawn

    Rectangular pool set into a lawn

    Nocatee, FL

  • New pool shell with a raised spa in blue mosaic tile and a paver deck, inside a screen enclosure before the interior finish is applied

    Pool shell before the interior finish

    Mandarin, FL

The process

How a new pool project runs

  1. 01

    Estimate

    We walk the yard, check access, grade, and setbacks, and talk through what you want. Free, and usually under an hour.

  2. 02

    3D design

    You see the pool, deck, and enclosure together in 3D before anything is dug. Shape, finish, lighting, all of it.

  3. 03

    Fixed quote

    A line-item quote. Shell, plumbing, equipment, finish, coping, deck, and cage each priced on their own line.

  4. 04

    Build

    A licensed Florida pool builder takes it from here, pulls the permit, and builds to the approved design.

  5. 05

    Walkthrough

    Once it passes final inspection you walk the finished pool with your builder, get the warranties, and learn how to run the equipment.

FAQ

Questions homeowners ask us

Free estimate

Get a fixed quote for your new pool

Pick a day that works. We confirm the time, walk the yard with you, and follow up with a 3D design and a fixed line-item quote.

  • Licensed, insured builders. Your pool is built by a licensed Florida pool builder you can look up.
  • Fixed line-item pricing. A fixed price for the scope you approve, priced line by line.
  • 3D design first. See the pool before a shovel touches the yard.
  • Free on-site estimates. No obligation.
  • One point of contact. The same person handles your design, your quote, and your questions.
CallGet Quote