Skip to content
HN Pool ConstructionJacksonville, FL

2026 cost guide

How Much Does a Pool Remodel Cost in Jacksonville, FL?

Finish comparisons, a line-item breakdown, and two worked examples for aging First Coast pools.

Mon-Fri 8am-9pm, Sat-Sun closed. We answer the phone.

Blue waterline tile meeting light stone coping at the edge of a pool
  • Licensed, insured builders

    Your pool is built by a licensed Florida pool builder you can look up

  • Fixed line-item pricing

    A fixed price for the scope you approve, priced line by line

  • 3D design first

    See the pool before a shovel touches the yard

  • Free on-site estimates

    No obligation

  • One point of contact

    The same person handles your design, your quote, and your questions

Resurfacing an older pool in the Jacksonville area runs $8,000 to $24,000 in 2026 depending on the finish, while a full remodel with new tile, coping, equipment, and deck work runs $25,000 to $70,000 or more. Where your project lands in that range depends mostly on pool size, how much of the shell and deck need repair, and which finish you choose.

What you get at each price level

2026 estimates for the Jacksonville area. Your lot, access, and finishes move these numbers. A site visit is what turns a range into a fixed price.

  • Resurface only

    $8,000 to $18,000

    Drain, surface prep, new plaster, quartz, or pebble finish on an otherwise sound shell.

  • Resurface plus tile and coping

    $16,000 to $35,000

    New finish plus waterline tile and coping replacement, addresses staining and cracked coping.

  • Full remodel

    $25,000 to $70,000+

    Finish, tile, coping, new equipment, lighting, and deck or cage work as one coordinated project.

What does a pool remodel cost by finish?

Finish choice affects both upfront cost and how long you go before the next remodel. Florida climate wears finishes faster than cooler states because pools here get used nearly year-round and sit under intense UV exposure.

2026 Jacksonville-area estimate by finish, with typical Florida lifespan
FinishCost rangeTypical life in Florida
Plaster$8,000 to $14,000About 7 to 10 years
Quartz aggregate$11,000 to $18,000About 12 to 15 years
Pebble$14,000 to $24,000About 20 to 25 years

What is the line-item breakdown of a pool remodel?

A remodel is really several smaller projects bundled together. A fixed quote separates them so you can see what a full remodel adds beyond a basic resurface.

Typical remodel line items
Line item2026 estimate rangeNotes
Drain and surface prep$800 to $2,500Includes hydrostatic relief check before draining
Finish (plaster, quartz, or pebble)$8,000 to $24,000See finish table above
Tile$2,500 to $8,000Waterline tile replacement, more for full tile jobs
Coping$2,500 to $7,000Often replaced together with tile for a matched look
Equipment (pump, filter, salt system, automation)$5,000 to $12,000Frequently upgraded during a remodel for efficiency
Lights$800 to $3,000LED conversion is the most common upgrade
Deck$10,000 to $30,000Full replacement of a cracked or settled deck, sized to footprint
Cage rescreen$2,000 to $8,000If the existing enclosure frame is sound but the screen is worn

What drives remodel costs up in Jacksonville?

A few conditions specific to older First Coast pools push a remodel above a simple resurface.

  • Pool size and surface area: a larger shell means more square footage of finish, tile, and coping, which scales cost directly.
  • Delamination repair: plaster that has bonded poorly to the shell can bubble or pop loose in sheets, which needs chipping out and patching before a new finish goes on.
  • Leak detection: a pool losing water beyond normal evaporation needs a leak detection service before a remodel, since resurfacing over an active leak wastes the new finish.
  • Converting to salt: adding a salt chlorine generator to a pool that ran on liquid or tablet chlorine is a common remodel add-on and needs new equipment and sometimes new bonding checks.
  • Adding a tanning ledge or spa: cutting a tanning ledge into an existing shell or adding a spa is structural work, closer to new construction cost than a simple resurface.
  • Deck replacement: a deck cracked from years of settling in Jacksonville sand, especially near the river or marsh, often needs full replacement rather than patching, which is one of the larger line items in a full remodel.

Do you need a permit to remodel a pool in Jacksonville?

A straightforward resurface generally does not need a building permit in most First Coast jurisdictions, but adding equipment that changes electrical load, cutting new structural features like a tanning ledge or spa, or replacing a deck typically does. The permitting authority depends on where you are: City of Jacksonville Building Inspection Division for most of Duval County, St. Johns County Building Services for Nocatee, Ponte Vedra Beach, St. Johns, and Julington Creek, Clay County Building Division for Fleming Island and Middleburg, and Nassau County Building Department for unincorporated Amelia Island and Yulee. Check with the specific office before assuming a permit is not required.

How long does a pool remodel take?

A resurface-only project usually takes one to two weeks from drain to refill, most of it curing time rather than active labor. A full remodel with tile, coping, equipment, and deck work typically runs four to eight weeks depending on scope and whether the deck needs full replacement. Permitting, where required, adds time on the front end before work can start.

When should you remodel a pool instead of replacing it?

Most older gunite pools are good candidates for remodeling rather than replacement, since the shell itself typically outlasts several finish cycles. A remodel makes sense when the shell is structurally sound, meaning no major cracking through the gunite, no chronic leak beyond a fixable spot, and the shape and depth still work for how you use the pool.

Replacement becomes the better option when the shell has significant structural cracking, when the pool needs to move or change size for a new deck or addition, or when a fiberglass shell has degraded beyond what a resurface can fix. Most remodels we see on the First Coast are 1980s through 2000s gunite pools that need a finish, tile, coping, and equipment refresh rather than a rebuild.

Worked example: a 1990s Mandarin gunite pool

A gunite pool built in the 1990s in Mandarin, showing plaster wear and an aging pump, is a typical remodel candidate. Draining, prep, and a pebble finish run roughly $14,000 to $22,000. New equipment, including a variable-speed pump, filter, and salt system, adds $6,000 to $11,000. Tile replacement along the waterline adds $3,000 to $6,000. Total: roughly $23,000 to $39,000, 2026 Jacksonville-area estimate, assuming the deck and coping are in good condition.

Worked example: a 2005 Julington Creek pool

A 2005 gunite pool in Julington Creek with dated tile and a straight-drive pump is a common full remodel. New tile and coping run $6,000 to $12,000. A quartz finish adds $11,000 to $16,000. A variable-speed pump and updated filter and automation add $5,000 to $9,000. LED lighting conversion adds $1,000 to $2,500. Total: roughly $23,000 to $39,500, 2026 Jacksonville-area estimate, before any deck work.

How do you get a fixed quote for a pool remodel?

A free on-site visit lets us drain-test or inspect the shell, check for leaks, and look at the deck and equipment pad condition. We put together a 3D design of the new finish, tile, and coping so you can see the result before work starts, then a fixed line-item quote covering every scope on this page, with any change during the project quoted in writing before it happens.

FAQ

Cost questions we get asked

Free estimate

Turn this range into your number

A free site visit is what separates a range from a price. We measure, check access and grade, and send a line-item quote.

  • Licensed, insured builders. Your pool is built by a licensed Florida pool builder you can look up.
  • Fixed line-item pricing. A fixed price for the scope you approve, priced line by line.
  • 3D design first. See the pool before a shovel touches the yard.
  • Free on-site estimates. No obligation.
  • One point of contact. The same person handles your design, your quote, and your questions.
CallGet Quote